Tree of Knowledge is a public infill building made entirely of timber — not only built of wood, but conceived as a tree. Its design is rooted in the image of a tree: a central mass forms the trunk, from which beams extend like branches. Together, trunk and branches form the load-bearing frame that supports the floors, while also acting as a generative force in the architecture. With the structure carrying the loads, the walls are free to open and change, released from any structural role.
Here, the engineering system, the choice of material, and the building’s character are inseparable. Apart from the basement, the entire building is assembled through ties and bolted connections, as though it could be dismantled and assembled again. Its temporary, sukkah-like character is expressed in its opening and changing walls, which nevertheless preserve the principle that shade must exceed sunlight. In this way, the building fulfills its purpose: to broaden the horizons of human understanding.
Timber Frame to Concrete Connection
A composite column formed by four timber members. Two connect to the concrete at ground level, while the other two connect to the raised concrete casting at approximately 30 cm.
- Oak timber members, 15×25 and 15×20 cm
- Steel blade connector, 10 mm
- Pre-cut connector slot, 20 cm high
- Concrete expansion anchor bolt
- Cast concrete to 15×25 and 15×20 cm profiles
- Continuation of the concrete casting
Connecting Beam
The connecting beams tie the four trunk columns together to form a stable structural core. Steel connectors are first anchored to the columns, then the timber beams are fitted over them through pre-cut slots and secured with through-bolts.
- Oak timber columns
- Oak beam, 20 × 40 cm
- Steel blade connector, 7 mm
- Flat-head wood screws
- Threaded steel dowel
Angled Branch Connector
Two branches are connected using a steel connector tailored to their specific angle. The angled steel connector is fastened to the main beam by a nut on a steel dowel inserted in advance. The branches slide over the connector through pre-cut slots and are secured with bolts.
- Main timber member, 20×40 cm
- Secondary timber member, 15×30 cm
- Angled steel connector, 10 mm
- Steel dowel, 10 mm
Articulated Connection Between Beams and Floor Plates
A steel blade connector with gusset is inserted at the end of the branch and locked with bolts. A T-connector with a rounded fin is attached to the gusset. A 5 cm oak board rests on the connector, above it a 20 cm internal beam, and above it another 5 cm oak board. On both sides of the internal beam, steel angles are fixed to receive the articulated connector attached to the branch.
- Top board, dressed oak, 5 cm
- Internal beam, 20 cm
- 4 mm steel angle, connected to the internal beam
- 12 mm steel bolt connecting the angle and the T-connector
- Bottom board, 5 cm oak
- T-connector with a rounded fin
- Blade connector with gusset plate
- Oak beam, 20×40

Steel Collar
Each column is composed of four timber members connected with hardwood dowels and bundled by a steel collar. The collar is made of two halves that lock together with bolts.
- Oak timber members, 15×25 and 15×20 cm
- 5 mm steel profile
- Bolted connection
Cantilevered Stair Support
The timber stairs, formed by side beams and oak treads, are supported by steel cantilevers connected to the main frame. The supports fit into pre-cut slots in the beams and are locked in place with bolts.
- Oak frame
- Side beam, 5×20 cm
- Dressed oak tread, 5×90 cm
- Blade inserted and bolted into the side beam
- Steel cantilever, 10 mm thick, variable height
- Through-bolting from side to side
- 2 mm steel load-distribution plate
Tension Anchoring of the Structural Frame
The rear tension anchorage prevents the structural frame from tilting forward under the loads acting on its front portion.
Cable Anchorage to the Steel Collar
- Oak timber members, 15×15 / 20×25 cm
- Steel collar, 5 mm
- Double steel angle bracket, 10 mm
- Cable end fitting
- Steel cable, 30 mm
Joining Cables and Changing Angle
Tension Cable Between Floor Levels
Cable Anchorage to Concrete
- Steel cable, 30 mm
- Articulated connector for two tension arms
- Steel cable, 60 mm
- Steel cylinder inside the timber beam
- Upper/lower locking thread
- Compression end anchor
- Cast-in connector

Green Wall and Water Drainage
Water draining from the roof is collected into a downspout that carries it through a hollow profile within the green wall frame and down to the water channel. Part of the water is retained to support plant growth, while the remainder drains outward.
- Oak panels, OSB board, waterproof membrane
- 4 inch plastic connector
- Green wall frame: aluminum frames with welded cable mesh for vegetation
- Timber slats, the building skin
- Lean concrete, 5 cm
- Steel grating
- Water channel, 16 cm
- Adjacent building